What is the trigger that changes the cost to build Supply Ships? The build cost increases by 8 or 10 Promethium Posted on Monday, July 11, 2022 Twice the build cost increased by 8 promethion and the 3rd time the cost increased by 10. My guess is the trigger has to do with the total production value for a shipyard. Thank you.